Checklist

9 of 9 complete
  • Implement and test real engine readiness, safe migration execution, and graceful Playfield shutdown.
  • Implement Compose and host orchestration with warning window, staged startup, locking, failure diagnostics, and independent portal replacement.
  • Add parallel cached Docker builds and tag/develop workflows with immutable release manifests.
  • Run builds, deployment regressions, review, and document safe provisioning/cutover and validation limitations.
  • Validate Forgejo execution and Ergo bootstrap/normal redeployment: image identities, readiness order, public endpoints, minimum warning duration, graceful restart and measured timings.
  • After separate authorization, provision and validate the independent Ithaca portal release, cookie/key continuity and failure recovery before replacing the retained legacy portal.
  • Prepare Ithaca non-disruptively: private env/config validation, trusted CI host pin, runtime-image cache, rollback inventory, notice configuration and backup-history check; verify production services unchanged.
  • Provision and validate Ithaca engine deployment: release tag, player warning, legacy stop, requested MSSQL restart, staged bootstrap, immutable image/readiness verification and public endpoint checks.
  • Verify real-player Ithaca login and zoning under the managed release.
Project
engines
Kind
Feature
Task ID
tsk_ah9pynd33g
Updated